
Protect it before the slab goes down
The easiest time to stop termites is before the building exists.
Before the pour.
Soil treated under the slab.
Any build.
Commercial and residential.
After the build.
Baiting can be added later.
Termite pre-treatment is the easiest and most effective time to protect a building from termites. Before the slab is poured, the soil underneath is wide open. Once concrete goes down, getting treatment under it means drilling. We pre-treat construction sites for builders, developers and general contractors on both commercial and residential projects around Kansas City.
Here is how termite pre-treatment works and how to schedule it.
Why pre-treat for termites
Termites in the Kansas City area are subterranean termites. They live in the soil and come up through cracks in slabs, expansion joints, plumbing penetrations and gaps around footings, often without being seen. Treating the soil before construction puts a treated zone under and around the building from day one.
Termites cause damage that’s expensive to repair, and they’re common here. Protecting a new building before it’s built costs far less than treating and repairing one later. See termites in Kansas City.
When we treat
Timing is the key to a good pre-treat. We spray before the slab is poured, after the site is graded, the forms are set and plumbing is roughed in, so treatment covers the soil that will end up under the slab. The general contractor or site supervisor tells us when the site is ready, and we schedule around the pour.
Plan ahead. Let us know when the pour is getting close so we can fit the treatment in before concrete is ordered. Rain or a soaked site can affect timing, so we stay in touch with the site as the date gets close.
What the pre-treatment covers
- Soil under the full slab area
- Around plumbing penetrations, where termites often find a way in
- Along footings and foundation walls
- Areas that will be under patios, porches or other slabs, if requested
Treatment is applied by our certified termite applicators.
What we need on site
- Clear access to the slab area
- Forms set and plumbing roughed in
- A site that isn’t flooded or soaked
- A contact on site who can confirm the area is ready
If the vapor barrier or other materials are scheduled to go down, we need to treat before they cover the soil. The site supervisor knows the sequence best, so we work off their timing.
Commercial and residential builds
We pre-treat for commercial projects and residential builds, including single-family homes, townhome developments and commercial buildings. Builders with ongoing projects can set up a process with us, so each new slab gets scheduled as it comes up.
After the building is up
A pre-treat isn’t the only option. A termite baiting system can be installed around a building after construction, and it also works well as ongoing protection on finished buildings. Termite inspections are free, and many owners combine baiting with an annual inspection. See termite treatment options.
Termite warranty
Our termite work carries a 1-year warranty, renewed each year with a paid inspection. The warranty covers new live activity at no extra cost. On a new build, the warranty transfers to the owner when the project is handed over.
Pre-treat vs treating later
Treating an existing building for termites usually means trenching along the foundation and drilling through slabs, patios and walkways. A pre-treat skips all of that because the soil is open. It’s one of the simplest ways to protect a new building and one of the easiest steps to forget in a busy build schedule.
Documentation for your project
Each treatment is documented with the date, area treated and the types of products used. We send the record by email so it can go into your project file and to the owner at closeout.
Other pest work on construction sites
Construction sites have more than termite needs. Office trailers, restrooms and materials stored outside or under pole barns attract mice and insects. Equipment yards see rodents nesting in machines. See pest control for construction sites and rodent control for construction equipment yards.
How to schedule a pre-treat
- Call or message us with the project address, type of build and expected pour date.
- We’ll confirm timing and what we need on site.
- The site supervisor lets us know when the site is ready.
- We treat before the pour and send the record.
For more on termites, see termite swarmers and what a termite inspection includes.
Our commercial team pre-treats builds across Kansas City. See termite control and commercial pest control.
Got a pour coming up? Call 913-735-5451, answered 24/7, or schedule online. Most services can be scheduled same day.
Frequently Asked Questions
Treating the soil before the slab is poured, so the building has termite protection from day one.
After grading, forms and plumbing rough-in, and before the slab is poured.
Yes. We pre-treat commercial and residential builds, spraying the soil before the slab is poured.
Yes. A termite baiting system can be installed around the building after it’s built.
Yes. Our termite work carries a 1-year warranty, renewed each year with a paid inspection.
Let us know as soon as you have an expected pour date, and we’ll confirm timing as it gets close.

